Chinasoft International (00354.HK): Wins RMB 44.155 Million Bid for Yalong River Hydropower Intelligent Operation Large Model Project
NewTimeSpace News: On June 29, 2026, Chinasoft International (00354.HK) announced that it, together with the National Meteorological Center and Nanjing NARI Water Resources and Hydropower Technology Co., Ltd., has secured the Yalong River hydropower intelligent operation large model project worth RMB 44.155 million.
As stated in the announcement, the project centers on four major segments: hydrometeorological forecasting, power dispatching, power station operation and maintenance, and electricity trading. Leveraging its FDE on-site delivery system and Allmeta platform, the company will realize full-process adaptation between large models and power generation operations. Yalong River Hydropower Development Co., Ltd. is a state-owned clean energy enterprise funded by China State Development & Investment Corporation and other investors, with a registered capital of RMB 50.7 billion. This successful bid marks a major breakthrough for the FDE solution in the smart energy sector.
NewTimeSpace Disclaimer: All content herein is the original work of NewTimeSpace. Any reproduction, reprinting, or use of this content in any other manner must clearly indicate the source as "NewTimeSpace". NewTimeSpace and its authorized third-party information providers strive to ensure the accuracy and reliability of the data, but do not guarantee the absolute correctness thereof. This content is for reference only and does not constitute any investment advice. All transaction risks shall be borne by the user.